2007-2008 Competition Plan
Fall 2007
Teams that submitted a Notice of
Intent (due September 14, 2007) will receive $1000 upon
receipt and acceptable evaluation of the conceptual design report.
Conceptual design report of the
whole satellite, subsystem (s), or payload is due Dec. 3, 2007.
Updated evaluation criteria for
the Conceptual Design: Due 12/03/07
1.
Scientific and
Technical Merit: 70%
·
The mission and/or
satellite design should be scientifically and technically sound. It
is very important that the winning design team shows a high level of
creativity and innovation.
2.
Design Maturity &
Feasibility: 20%
·
The conceptual design
must justify support for a detailed design in spring 2008. This
requirement will be subjective so every effort must be made to
explain fully all design areas.
·
Feasibility,
coverage, and completeness of the design would be demonstrated by technical
analysis and simulation, trade study, and identification of all
major parts/components.
·
Existing subsystem
designs and COTS can be utilized while it may affect the evaluation
on Item 1.
3.
Soundness of the development plan: 10 %
·
It is essential to
submit a good plan for the detailed design of your satellite
1)
Budget
2)
Major developments &
schedule
3)
Team Charts:
organization diagram that shows the development team (students
& their disciplines), mentor,
and other supports
Spring 2008
Detailed design report is due on
April 18, 2008 (tentative)
FUNSAT IV Workshop will be held in
May 2nd, 2008 (tentative). Details will follow when
determined.
Final detailed design reports
MUST include construction plans and budget
A winning design will be selected
based on the design report and workshop presentation
Winning team will be given no less
than $7,500 (whole satellite) / $2,500 (subsystem / payload) for
flight model construction and testing
2006-2007 Winner – University of Central Florida
Summer 2008 ~ Spring 2009
The winning team
will build the flight model |